Auto Cuz Lgsf Light Gauge Steel Framing / Frame House Building Purlin Metal Stud Cold Roll Forming Making Machine with CE Certificate 1 Year Warranty Good Price
Basic Info.
Model NO. | 80-300 |
Transport Package | Naked Packing with Fixing |
Specification | 183/190 |
Trademark | Reliance |
Origin | China |
HS Code | 845522 |
Product Description
Product DescriptionThe fully automatic C/Z steel integrated machine is also called the C/Z interchange molding machine, and C and Z interchange purlin machine. The fully automatic CZ purlin machine provides users with highly automated purlin forming equipment that can realize the interchange production of C/Z two models and various specifications purlins in a short time by PLC computer control. The production process of the fully automatic C and Z interchange purlins is completely automatic, and there is no need to change the forming rollers when changing the specifications. The invention of the C&Z purlin forming machine has changed the history of processing C and Z different purlins by using two different C and Z equipment, saving users lots of investment cost and space.
Detailed PhotosProduct ParametersApplication | |||||
In all metal or mixed building roof systems, purline members are frequently constructed from cold-formed steel C or U or M or Z sections. Purline roll forming machine is special designed for its production. | |||||
Work Flow | |||||
Option 1: De-coiling→Entry Guide→Leveling→Pre-Punching→Pre-Cutting→Rollformer→Straightening→ Run Out Table | |||||
Option 2: De-coiling→Entry Guide→Leveling→Rollformer→Straightening→Hydraulic Post-Punching & Cutting→Run Out Table | |||||
Technical Parameters | |||||
1 | Suitable Material | Galvanized Steel Coil / Hot Rolled Steel / Cold Rolled Steel | |||
2 | Material Width | According to Profile Drawing | |||
3 | Material Thickness | 1.0-3.0 mm | |||
4 | Roll forming speed | 10-15 m/min (Exclude Punching & Cutting Time) | |||
Equipment List | |||||
1 | Hydraulic Decoiler with Breaking device is equipped for coil processing | 1 set | |||
2 | Entry Guide + Five(5)-Roll Leveler | 1 set | |||
3 | Hydraulic Pre-Punching Device | 1 set | |||
4 | Hydraulic Pre-Cutting Device | 1 set | |||
5 | Rollformer with tooling | 1 set | |||
6 | Run out table | 1 set | |||
7 | Siemens Or Mitsubishi PLC and Touchable Screen are used for data processing and setting | 1 set |
Fully automatic multi-size adjusting on PLC screen.
Fully automatic C & Z changeover mode on PLC screen.
High Forming speed: 30m/min
Certified with Multi-Patents; CE Certified, EUROPEAN quality standard
1. What's your warranty?
Two years, during which all parts damaged because of the quality problem will be changed for free, but not include damage caused by natural disaster or inappropriate operation or human factor.
2. What's your delivery time?
Within 60 days after receiving prepaid. Some machines are in stock, so can be delivered at any time.
3. What are your payment terms?
30% deposit is paid before production, the balance should be paid after inspection confirmation and before shipment.
4. What's your install and training?
If buyers come to our factory to inspect, the training to install and operate is provided face to face.
If not, a manual and video are provided to show how to install and operate.
5. What's your after-sale service?
We provide 24-hour online service for our customers.
(1) The seller will test the machines freely in China, and the traffic expense in
China of the technique people will be paid by the seller. When our engineer goes to the buyer's place to test the machines, the buyer should pay the expense of accommodation, and traffic for the buyer's engineer.
(2) If the buyer sends people to receive the training of the operation given by the seller, during the training period, the seller should pay the expense of accommodation, and traffic for the buyer's engineer, as well as daily salary of USD 150.
6. How to place an order?
Inquiry---Confirm the profile drawings and price----confirm the PI---Arrange the deposit or L/C---Start design and production--- Test and inspection --- Pay the balance --- Arrange shipping